Showing posts with label Bicycle Frame Building. Show all posts
Showing posts with label Bicycle Frame Building. Show all posts

Tuesday, May 27, 2008

Complete Handmade Bicycle!

Took it on it's first test ride on the W+OD trail! It rode surprisingly well for my first frame. Also took it into DC today and rode around the city without any problems.
Next on the list is to build another one without lugs. Plan on just doing some fillet brazing. Also want to tackle a fork (sorry for the Tange in the picture;).

Thanks to all my friends and family that supported my efforts!

Special thanks to Plum Grove Cyclery for their expert help, Campy frame tools and necessary build out parts. Could not have done it without them.

Special thanks to Rich Adams and Around Town Bicycles in Wilkes Barre PA. The have been very supportive and Rich was always willing to answer my emails.

I plan on doing a more verbose post about the whole experience soon.... stay tuned.

Sunday, May 11, 2008

Practice Bicycle Lugs

Can probably never get enough practice on brazing lugs. Special thanks to AntBikeMike for sending me some practice lugs.

Bicycle Frame Complete!

First bicycle frame complete! I started working on the lug cleanup and will get ready for paint. I may clear coat it so I can remind myself later about the quality of the initial lugs/brazing.

All and all I am pleased with the way it came out. Clean up and test ride remains!. Will write up a longer post later about lessons learned and thanks to all that supported this effort.

Bicycle Frame - Seat Stay Bridge Installed

Last braze to be done before frame is finished (well finished all but the cleanup/eye candy). Cut left over seat stay to fit as bridge. Fixie so I don't need a hole for the brakes.


Brazing Done! Also cut the seat tube binder! Frame Complete!


Monday, April 14, 2008

Bicycle Chain Stays

Chain Stays have been notched and the track style dropout has been brazed on.

Having a bit of a problem with the far chain stay as it hits the frame jig before it is seated properly against the dummy axle.

In the process of figuring out why the chain stay won't fit the jig. Good chance I did something wrong... more later.

Bicycle Frame Front Triangle - Chain Stays


Front Triangle is complete. Head tube and seat tube have been reamed thanks to my friends at Plum Grove Cyclery. Working on the chain stays now. Have a bit of a problem with alignment in the jig....

Sunday, February 24, 2008

Bicycle Seat Stays and Chain Stays

Next step in the frame building process is to figure out the rear triangle (I know, don't have the main triangle quite done yet). This will be a track bike as you can see and will use a vintage style seat stay attachment flute.

Makeshift Bicycle Alignment Table

I had a piece of 1 inch plate hanging around and jury rigged a bottom bracket holder. It worked pretty well. Need to work on the bottom bracket holder some more to get rid of the washers as they are not strong enough. But like I said it seemed to work well enough for now.

Close up view of the bottom bracket holder. Had some old machined tractor parts hanging around that worked out quite well. Drilled out the plate and attached the fixture and was able to cold set my first seat tube / bottom bracket assembly.

Bicycle Frame - Front Triangle Ready to Braze!

Main triangle is all setup and triple checked for proper length. Next steps will be to get jig all set in place, remove pieces and add all the flux and reassemble in jig. Tack all the joints (maybe complete in jig, not sure yet) and check for alignment before finishing all the joints.

Tuesday, January 15, 2008

Slow Frame Building Progress

Not a lot going on in the frame building front. Working on getting an alignment table figured out before I can go much further. Will probably not get the frame complete by the time I go to the Handmade Bicycle Show in Feb.

Monday, December 10, 2007

First Lugged Joint - Bottom of Head Tube / Down Tube

My first brazed lug! I bit more brass than I probably needed so the cleanup was a bit much. I do think that the penetration of the joint was good though. I did some cold setting on it and it did not flinch. Overall I am pleased with the newbie attempt.

Going to find a source for "blemished" lugs so that I can practice a whole lot without breaking the bank.

Sunday, December 09, 2007

Getting Down Tube Length - Frame Layout

With the bottom bracket / seat tube down I can pull the down tube length from the drawing. Carefully aligning the frame over the drawing with the help of a machinist square and v-blocks I can now scribe the lines where the down tube intersects the bottom bracket. Also note, only the lug is only attached to the head tube at this point.
With the frame aligned about the drawing I can scribe the lines where the bottom bracket and down tube intersect. Notch out the lines and the down tube length is done.

Frame Building -ST/ BB Weld Done!

The seat tube is brazed in the bottom bracket shell. I can start pulling off the rest of the dimensions from the drawing. I am using a reasonably flat surface from and old cast iron table saw.
The brazing is not cleaned up yet. Will work on that soon. Also, it is a pretty messy joint but seems to be solid which is what I am most worried about for now.

Thursday, November 22, 2007

Frame Drawing - Using the Paterek Method

Drawing out the first frame. Pretty much completed the drawing so I can get my final tube lengths and cut the final miters.

Head tube - small frame so lugs are pretty close to one another.

Bottom bracket shell will dictate the angle of the down tube. I am struggling with final alignment of lugs/tubing but I think a lot of cold setting and lug prep will do the trick.

Monday, November 19, 2007

Drafting Table up and Running

Went old school and picked up a drafting table to hand draw my bicycle frames on!

Details and pics coming soon...

Sunday, October 14, 2007

Finished BB / Seat Tube Notch

Good notch will allow BB to fit without a problem.

Finish the Notch

File the finishing touches on the tube. This is the most tedious part of all but the snugger the fit the less chance of frame distortion.

Grind Rough Notch on Grinding Wheel

Carefully grind as close as you can to the scribe line.

Rough Scribed Lug

Hard to see the scribe line in the picture but it is there. Grinding/Filing to the line is the next step.

Rough Marking for Notch Cuts using Lugs as a Guide

Blue the tubing and scribe the notch via the lug. Pictured here is the top tube and top head tube lug.